Project Summary
Saulsbury performed all civil work for the complete installation of foundations and under and above ground I&E for a 550-MW natural gas-fired power plant in Hobbs, New Mexico.
This was a schedule-driven project with bonus incentives for safety and schedule which were both achieved.
—
Scope of the Project
- Poured 11,312 yards of concrete
- Two gas-fired combustion turbine/generators
- One GE steam turbine
- Two HRSG
- One air-cooled condenser
- Ancillary equipment
- Pipe rack / MPS foundations
- Containment pads, area paving