Project Summary
Saulsbury has performed electrical, instrumentation, civil, and mechanical construction for all infrastructure connecting a mainline pipeline to two 250,000-bbl storage tanks.
—
Scope of the Project
- Custody quality meter skid
- LPMR system
- Sampling system
- Receipt manifold
- Tank laterals
- Tank pumps with suction lines
- Discharge piping to truck rack
- Oil-water separator
- Additive and holding tanks with associated piping and pumps
- Truck loading skid with piping and loading arms
- Vapor piping to VCU