—
Project Summary
Saulsbury further strengthened its partnership with a long-time client in the Delaware Basin with the construction of multiple gathering systems in Carlsbad, New Mexico.
—
Project Scope
- LP – 8,268 feet of 16-inch SDR-7
- LP Phase Two – 5,300 feet of 16-inch SDR-7
- HP – 39,900 feet of 10-inch Zap-Lok™
- HP Phase Two – 7,050 feet of 8-inch and 10,930 feet of 6-inch Zap-Lok™
- Water – 15,250 feet of 16-inch SDR-9
- Water Phase Two – 10,300 feet of 16-inch SDR-9
- Oil – 4,635 feet of 8-inch pipe
- Oil Phase 2 – 6,500 feet of 8-inch Zap-Lok™